Gostaresh Ahan Rah Company is active in the undermentioned fields in the transport industry, especially railway transport by organizing specialized groups in roads, tracks and railway and road structures, communications and electronic signals, and construction (facilities and buildings):
• Maintenance and repairs of wired and wireless telecommunications equipment
• Maintenance and repairs of technical tracks and structures
• Maintenance and repairs of electric signals equipment
• Maintenance and repairs of fire communications, fire extinguishing, and urban tunnels ventilation systems
• Maintenance and repairs of mechanical and electric buildings and facilities in urban tunnels, and in railway and metro stations
• Designing and manufacturing equipment and parts for signal and traffic control systems
• Designing and manufacturing equipment and parts for machines, engines, etc.
• Executing roadbed and pavement of roads, railway tracks, and technical buildings
The project management office (PMO) department of Gostaresh Ahan Rah (GAR), takes the necessary actions in four stages to align the projects with the company’s portfolio goals considering the customers’ satisfaction following PMBOK standards and project life cycle.
1. Identification phase
It is conducted to identify the stakeholders’ and shareholders’ needs and determine the exact range of variables (time, cost, and resources), and it includes:
1.1. Identifying the client’s needs
1.2. Feasibility
1.3. Determining project activities
1.4. Identifying clients’ property
1.5. Determining measurement tools
1.6. Determining activeness acceptance criteria
2. Planning phase
It is conducted to properly increase efficiency while doing activities and using resources and includes:
2.1. Human resources management planning
2.2. Workshop equipping management planning
2.3. Risk management planning
2.4. Time management planning
2.5. Cost management planning
3. Control phase
Reporting and project development control are conducted in specific time intervals to supervise the execution of the project in accordance with auditing and the project life cycle. Furthermore, by holding meetings with project pillars, deficiencies are investigated and necessary suggestions are provided to the honorable project manager of the company and project stakeholders in line with optimizing the project procedures to increase client satisfaction.
4. Final phase
Final reports of the project are conducted and prepared, and it includes:
4.1. Provisional handover
4.2. Final handover
4.3. Maintenance of records and documents